Not always. A modest single-storey rear extension to a house can often be built under permitted development, without a planning application. A larger one may qualify through prior approval, a lighter process with neighbour consultation. Anything beyond those limits, and any extension to a flat, needs full planning permission. The house's designations and planning history usually decide the route, so we check them before drawing anything.
Single-storey rear extensions under permitted development
A single-storey rear extension to a house is normally permitted development where:
- It extends no more than 3 metres beyond the original rear wall of a terraced or semi-detached house, or 4 metres for a detached house.
- It is no more than 4 metres high, and no more than 3 metres high at the eaves if it is within 2 metres of a boundary.
- Together with other outbuildings and extensions, it covers no more than half the land around the original house.
- Materials are similar in appearance to the existing house.
"Original" means the house as first built, or as it stood on 1 July 1948. Earlier extensions count against the allowance.
Larger extensions through prior approval
Outside conservation areas and other designated land, a single-storey rear extension can go to 6 metres on a terraced or semi-detached house, or 8 metres on a detached house, through the larger home extension prior approval route. The council notifies the adjoining neighbours and has 42 days to decide. If a neighbour objects, the council considers the effect on their amenity, mainly light and outlook. Once built, the council must be told in writing that the extension is complete.
Two-storey rear extensions
A two-storey rear extension is permitted development only if it projects no more than 3 metres, is at least 7 metres from the rear boundary and keeps a roof pitch that matches the house. On most London terraces and semis, those limits leave little room, so double-storey extensions usually need a planning application.
When planning permission is required
- Flats and maisonettes. They have no householder permitted development rights.
- Conservation areas. Two-storey rear extensions, side extensions and cladding are not permitted development, and prior approval for larger extensions is not available.
- Article 4 directions that remove extension rights in particular streets.
- Listed buildings, which also need listed building consent.
- Rights removed by condition, common on newer estates and conversions.
- Wrap-around extensions, where a rear extension joins a side extension, which are judged as one and normally need permission.
Make it certain
Where no permission is needed, we still advise a lawful development certificate before work starts. It is the council's formal confirmation that the work is lawful, and buyers' solicitors routinely ask for it.
Every extension also needs building regulations approval, and work on or near a shared wall usually needs party wall notices. For lofts, see do I need planning permission for a loft conversion?